精选案例
中凯建德电子工程设计
Jolywood Solar( Taizhou) Project

-location: Taizhou,JiangSu

-Area: 75,000 M2

-Required/ Actual Schedule: 180 Days/ Processing

-Investor: Jolywood Solar(Taizhou) Co., Ltd.(Stock Code: SZ300393)

-Scope of work: Engineering, Procurement and Construction

-Project features: Annual output 2.1GW N-type Monocrystalline double side solar cell, main product is N-type Monocrystalline double side solar cell. Including civil engineering, M&E installation, purify decoration, special gas and chemical system. Phase I have completed, phase II is processing, start from 8th February 2017, process equipment move-in on 15th July, 2017.

Longi (Pucheng) 40MW photovoltaic station project

-location: Pucheng, Weinan, shaanxi

-Value: 3.91 Billion

-Required/ Actual Schedule: 150 Days/ 150Days

-Investor: Longi Ecological agriculture photovoltaic new energy (Pucheng) Co., Ltd.

-Scope of work: Engineering, Procurement and Construction

-Project features: Give full consideration to the growing needs of local agriculture, adopt the fixed adjustable angle support system, flat single axis tracking system, inclined single axis tracking system and other forms of high support system, to achieve intelligent tilt adjustment for spring, summer, fall and winter, and realized double layer agriculture complementary mode of "high level power generation and lower level cultivation".



Longi (Kuching) 600MW cell workshop, monocrystalline workshop renovation and new build warehouse project 

-location: Kuching, Sarawak, Maylaysia

-Investment: 16.37 Billion

-Required/ Actual Schedule: 245/240Days

-Investor: Longi (Kuching) Co., Ltd.(Stock Code: Longi Share SH601012)

-Scope of work: Engineering, Procurement and Construction

-Project features: This Project is the first production project in the world to build complete

monocrystalline silicon industry chain at the same place. The project was reconstructed and

expanded on the basis of the acquisition of 2 old plants, and built a whole industry chain

production line with single crystal control, slicing, high efficiency single crystal PERC battery and

component function. 

Jolywood Solar( Taizhou) Project
Jolywood Solar( Taizhou) Project
Project name: Jolywood Solar( Taizhou) Project-location: Taizhou,JiangSu-Area: 75,000 M2-Required/ Actual Schedule: 180 Days/ Processing-Investor: Jolywood Solar(Taizhou) Co., Ltd.(Stock Code: SZ300393)-Scope of work: Engineering, Procurement and Construction-Project features: Annual output 2.1GW N-type Monocrystalline double side solar cell, main product is N-type Monocrystalline double side solar cell. Including civil engineering, M&E installation, purify decoration, special gas and chemical system. Phase I have completed, phase II is processing, start from 8th February 2017, process equipment move-in on 15th July, 2017.
Longi (Pucheng) 40MW photovoltaic station project
Longi (Pucheng) 40MW photovoltaic station project
Project name: Longi (Pucheng) 40MW photovoltaic station project-location: Pucheng, Weinan, shaanxi-Value: 3.91 Billion-Required/ Actual Schedule: 150 Days/ 150Days-Investor: Longi Ecological agriculture photovoltaic new energy (Pucheng) Co., Ltd.(Stock Code: Longi ShareSH601012)-Scope of work: Engineering, Procurement and Construction-Project features: Give full consideration to the growing needs of local agriculture, adopt the fixed adjustable angle support system, flat single axis tracking system, inclined single axis tracking system and other forms of high support system, to achieve intelligent tilt adjustment for spring, summer, fall and winter, and realized double layer agriculture complementary mode of "high level power generation and lower level cultivation".
Longi (Kuching) 600MW cell workshop, monocrystalli
Longi (Kuching) 600MW cell workshop, monocrystalli
-location: Kuching, Sarawak, Maylaysia-Investment: 16.37 Billion-Required/ Actual Schedule: 245/240Days-Investor: Longi (Kuching) Co., Ltd.(Stock Code: Longi Share SH601012)-Scope of work: Engineering, Procurement and Construction-Project features: This Project is the first production project in the world to build completemonocrystalline silicon industry chain at the same place. The project was reconstructed andexpanded on the basis of the acquisition of 2 old plants, and built a whole industry chainproduction line with single crystal control, slicing, high efficiency single crystal PERC battery andcomponent function. This project was EPC, the design capacity was 1000MW, the production lineand power equipments capacity amount of phaseⅠis 600MW. In order to ensure the constructionperiod and reduce the initial cost of investment, we adopted the mode of introducing majorproduction equipments from China and purchasing construction materials locally. Finally, we havecompleted the installation of production equipment and production debugging 5 days ahead ofschedule successfully.-Project characteristics: The original production line of polycrystalline ingot slicing needed to beguaranteed not to stop production in the process of construction and transformed its function;The new component plant, power station and warehouse were built, carrying out construction ofM&E installation at the same time. This project set production and transformation in one, and civilconstruction and M&E installation carried out at the same time. The construction was difficult andthe schedule was tight.
Selected cases
China Construction KiDE Engineering Corporation
Design chart

Be anxious about client's anxiety, thinking about what client think

Corporate Culture
Core value: Benefit employees, Return society
Talents management concept:Provide an ideal platform for every ideal employee
Business philosophy: Be anxious about client's anxiety, thinking about what client think
Vision:Clobal industry chain integration EPC contractor famous international engineering corporation

 Quality, environment, occupational health and safety policy
Safety First, Precaution Primary
People oriented, Harmony together
Professional and quality excellent, customer satisfaction
Innovation guiding, sustained developing
Contact information
         Building E4, Headquarters economic port, No.888, Chenglong Road,          National Economic Development Zone, Chengdu, Sichuan, China

Project