Jolywood Solar( Taizhou) Project

-location: Taizhou,JiangSu

-Area: 75,000 M2

-Required/ Actual Schedule: 180 Days/ Processing

-Investor: Jolywood Solar(Taizhou) Co., Ltd.(Stock Code: SZ300393)

-Scope of work: Engineering, Procurement and Construction

-Project features: Annual output 2.1GW N-type Monocrystalline double side solar cell, main product is N-type Monocrystalline double side solar cell. Including civil engineering, M&E installation, purify decoration, special gas and chemical system. Phase I have completed, phase II is processing, start from 8th February 2017, process equipment move-in on 15th July, 2017.

Longi (Pucheng) 40MW photovoltaic station project

-location: Pucheng, Weinan, shaanxi

-Value: 3.91 Billion

-Required/ Actual Schedule: 150 Days/ 150Days

-Investor: Longi Ecological agriculture photovoltaic new energy (Pucheng) Co., Ltd.

-Scope of work: Engineering, Procurement and Construction

-Project features: Give full consideration to the growing needs of local agriculture, adopt the fixed adjustable angle support system, flat single axis tracking system, inclined single axis tracking system and other forms of high support system, to achieve intelligent tilt adjustment for spring, summer, fall and winter, and realized double layer agriculture complementary mode of "high level power generation and lower level cultivation".



Longi (Kuching) 600MW cell workshop, monocrystalline workshop renovation and new build warehouse project 

-location: Kuching, Sarawak, Maylaysia

-Investment: 16.37 Billion

-Required/ Actual Schedule: 245/240Days

-Investor: Longi (Kuching) Co., Ltd.(Stock Code: Longi Share SH601012)

-Scope of work: Engineering, Procurement and Construction

-Project features: This Project is the first production project in the world to build complete

monocrystalline silicon industry chain at the same place. The project was reconstructed and

expanded on the basis of the acquisition of 2 old plants, and built a whole industry chain

production line with single crystal control, slicing, high efficiency single crystal PERC battery and

component function. 

Jolywood Solar( Taizhou) Project
Jolywood Solar( Taizhou) Project
Longi (Pucheng) 40MW photovoltaic station project
Longi (Pucheng) 40MW photovoltaic station project
Longi (Kuching) 600MW cell workshop, monocrystalli
Longi (Kuching) 600MW cell workshop, monocrystalli
Selected cases
China Construction KiDE Engineering Corporation
Design chart

Be anxious about client's anxiety, thinking about what client think

Corporate Culture
Core value: Benefit employees, Return society
Talents management concept:Provide an ideal platform for every ideal employee
Business philosophy: Be anxious about client's anxiety, thinking about what client think
Vision:Clobal industry chain integration EPC contractor famous international engineering corporation

 Quality, environment, occupational health and safety policy
Safety First, Precaution Primary
People oriented, Harmony together
Professional and quality excellent, customer satisfaction
Innovation guiding, sustained developing
Contact information
         Building E4, Headquarters economic port, No.888, Chenglong Road,          National Economic Development Zone, Chengdu, Sichuan, China

Project