Project display
China Construction KiDE Engineering Corporation
Talesun Solar Thailand Project
Talesun Solar Thailand Project
Project name: Talesun Solar Thailand Project-location: Rayong, Thailand-Area: 33,000 M2-Required/ Actual Schedule:-Investor: ZhongLi (Jiangsu) Group Co., Ltd.(Stock Code: 002309)-Scope of work: Engineering design-Project features: 500MW solar cell workshop, 500MW module workshop. The cell workshop cleanliness level is 100K, diffusion workshop cleanliness level is 1K.
Trina Solar Thailand Project
Trina Solar Thailand Project
Project name: Trina Solar Thailand Project-location: Rayong, Thailand-Area: 53,000 M2-Schedule: 10 Month-Investor: Trina Solar(Stock Code:NYSE:TSL)-Scope of work: Engineering, Procurement and Construction, Construction management-Project features: 700MW solar cell workshop, 500MW module workshop. The cell workshop cleanliness level is 100K, diffusion workshop cleanliness level is 1K.
Mid Atlantic Seafood Project
Mid Atlantic Seafood Project
Project name: Mid Atlantic Seafood Project-location: Guyana, South America-Area: 22,000 M2-Schedule: 10 Months/Processing-Investor:PRITIPAUL SINGH INVESTMENT INC.-Scope of work: Engineering, Procurement and Construction-Project features: Seafood processing factory, including workshop of fish and shrimp, big freezer room.  Use automatic processing equipment, stored in -25℃ freezer room after quick-freeze and then shipping out.
Mission Food Malaysia
Mission Food Malaysia
Project name: Mission Food Malaysia-location: Kuala Lumpur, Malaysia-Area: 18,500 M2-Schedule: 12 Month-Investor: Mexico-Scope of work: Engineering, Procurement and Construction-Project features: Fully automatic flour food factory, including workshop, office and raw material warehouse. Set many set of big silos, oil tank and waste water treatment station outdoor, with 1,600 M2 freezer room( -25℃). Food grade cleaning requirements are adopted in the workshop.
Comtec Solar International (M) Sdn. Bhd.
Comtec Solar International (M) Sdn. Bhd.
Project Name: Comtec Solar International (M) Sdn. Bhd.-Construction Site: Sarawak, Malaysia-Investment Scale: 70,500㎡-Request / Actual Duration: 12 months-Investor: Comtec Solar Systems Group Limited(Stock Code:HK00712)-Service Content: Design, Management and General Contract-Project Features: Two floor 700MW solar monocrystalline workshop and matched slicing and power workshop.
Longi (Pucheng) 40MW photovoltaic station project
Longi (Pucheng) 40MW photovoltaic station project
Project name: Longi (Pucheng) 40MW photovoltaic station project-location: Pucheng, Weinan, shaanxi-Value: 3.91 Billion-Required/ Actual Schedule: 150 Days/ 150Days-Investor: Longi Ecological agriculture photovoltaic new energy (Pucheng) Co., Ltd.(Stock Code: Longi ShareSH601012)-Scope of work: Engineering, Procurement and Construction-Project features: Give full consideration to the growing needs of local agriculture, adopt the fixed adjustable angle support system, flat single axis tracking system, inclined single axis tracking system and other forms of high support system, to achieve intelligent tilt adjustment for spring, summer, fall and winter, and realized double layer agriculture complementary mode of "high level power generation and lower level cultivation".
30MW photovoltaic poverty alleviation power statio
30MW photovoltaic poverty alleviation power statio
Project Name: 30MW photovoltaic poverty alleviation power station project-Location: Yan’an, Shanxi Province-Value: 2.5 billion-Request/ actual schedule:110/119 days-Investor: Longfu Clear Energy (Huanglong) Co., Ltd.(Stock Code: Longi ShareSH601012)-Scope of work: Engineering, Procurement and Construction-Project features: The project is mountain structure, the combination of group string and distributed type is adopted, consisting of 10 MWp string type and 20 MWp collecting-distributing type. The project is located in secondary-level collapsible loess, the pile foundation adopts single-row pored piles, the embedded depth of foundation is 2 meters, exposed 0.3 meters, and the upper part is adjustable steel support. The minimum distance from the ground is 1.5 meters.
YuJiang 30MWp distributed complementary photovolta
YuJiang 30MWp distributed complementary photovolta
Project name: YuJiang 30MWp distributed complementary photovoltaic power generation project-location: Yujiang, Yingtan, Jiangxi-Value: 2.5 Billion-Required/ Actual Schedule: 140 Days/ 138Days-Investor: Xinyang new energy (Yujiang) Co., Ltd.-Scope of work: Engineering, Procurement and Construction-Project features: Design and construction of PV plant, 110KV converting station and all the output route. Laying photovoltaic modules on wasteland, an integrated development project setting agricultural planting, solar energy generation together, aiming to improve the local living standards, improve the rural production and living environment, provide energy supply, Develop the rural circular economy and the tourism industry with agricultural characteristics.
Yushan county photovoltaic Project
Yushan county photovoltaic Project
Project Name: Yushan county photovoltaic Project-Location: Shangrao, Jiangxi-Value: 30 million-Request / Actual Schedule: 60/59 days-Investor: Shenheng Technology (Shangrao)Co., Ltd.-Scope of work: Engineering, Procurement and Construction-Project features: The photovoltaic components are laid on the roof of the factory building, and the group connection structure is adopted. The development project combines the industrial characteristic production and the solar power generation. It is a green environmental project and makes full use of the idle roof of the industrial building.
Project name: Lerri Solar (Taizhou) 2GW cell works
Project name: Lerri Solar (Taizhou) 2GW cell works
Project name: Lerri Solar (Taizhou) 2GW cell workshop project-location: Taizhou, Jiangsu-Value: 10 Billion-Required/ Actual Schedule: 180 Days/ 170Days-Investor: Lerri Solar technology (Taizhou) Co., Ltd.-Scope of work: Engineering, Procurement and Construction-Project features: The old plant is an abandoned metal products processing plant, the structure have used 20 years. Renovation the old building and new build power station. The renovation workshop area is more than 58,000M2, warehouse 5,000M2, canteen, office and accommodation 13,000M2. Each workshop divided into four parts: Monocrystalline Texturing workshop (100K), super clean workshop (10K), coating workshop (100K) and Screen Printing workshop.
Jolywood Solar( Taizhou) Project
Jolywood Solar( Taizhou) Project
Project name: Jolywood Solar( Taizhou) Project-location: Taizhou,JiangSu-Area: 75,000 M2-Required/ Actual Schedule: 180 Days/ Processing-Investor: Jolywood Solar(Taizhou) Co., Ltd.(Stock Code: SZ300393)-Scope of work: Engineering, Procurement and Construction-Project features: Annual output 2.1GW N-type Monocrystalline double side solar cell, main product is N-type Monocrystalline double side solar cell. Including civil engineering, M&E installation, purify decoration, special gas and chemical system. Phase I have completed, phase II is processing, start from 8th February 2017, process equipment move-in on 15th July, 2017.
Longi (Kuching) 600MW cell workshop, monocrystalli
Longi (Kuching) 600MW cell workshop, monocrystalli
-location: Kuching, Sarawak, Maylaysia-Investment: 16.37 Billion-Required/ Actual Schedule: 245/240Days-Investor: Longi (Kuching) Co., Ltd.(Stock Code: Longi Share SH601012)-Scope of work: Engineering, Procurement and Construction-Project features: This Project is the first production project in the world to build completemonocrystalline silicon industry chain at the same place. The project was reconstructed andexpanded on the basis of the acquisition of 2 old plants, and built a whole industry chainproduction line with single crystal control, slicing, high efficiency single crystal PERC battery andcomponent function. This project was EPC, the design capacity was 1000MW, the production lineand power equipments capacity amount of phaseⅠis 600MW. In order to ensure the constructionperiod and reduce the initial cost of investment, we adopted the mode of introducing majorproduction equipments from China and purchasing construction materials locally. Finally, we havecompleted the installation of production equipment and production debugging 5 days ahead ofschedule successfully.-Project characteristics: The original production line of polycrystalline ingot slicing needed to beguaranteed not to stop production in the process of construction and transformed its function;The new component plant, power station and warehouse were built, carrying out construction ofM&E installation at the same time. This project set production and transformation in one, and civilconstruction and M&E installation carried out at the same time. The construction was difficult andthe schedule was tight.
Corporate Culture
Core value: Benefit employees, Return society
Talents management concept:Provide an ideal platform for every ideal employee
Business philosophy: Be anxious about client's anxiety, thinking about what client think
Vision:Clobal industry chain integration EPC contractor famous international engineering corporation

 Quality, environment, occupational health and safety policy
Safety First, Precaution Primary
People oriented, Harmony together
Professional and quality excellent, customer satisfaction
Innovation guiding, sustained developing
Contact information
         Building E4, Headquarters economic port, No.888, Chenglong Road,          National Economic Development Zone, Chengdu, Sichuan, China